{"DocTree_ID":"Z9Z%2biRpsVvU%3d","DocTree_BodyText":"

Part 2 - Zones and Sub Zones

\u00A0

Recreation Zone


\n
\u00A0

Assessment Provisions (AP)


\n
\u00A0

Desired Outcome (DO)

\u00A0
Desired Outcome
DO 1

Provision of a range of accessible recreational facilities.

\n
\u00A0

Performance Outcomes (PO) and Deemed-to-Satisfy (DTS) Criteria / Designated Performance Feature (DPF)


\n
\u00A0
Performance OutcomeDeemed-to-Satisfy Criteria / Designated Performance Feature
Land Use and Intensity
PO 1.1

Development is associated with or ancillary to the primary purpose of structured, unstructured, active and / or passive recreational facilities.

DTS/DPF 1.1

Development comprises one or more of the following:

  1. Car parking
  2. Change rooms
  3. Golf course
  4. Indoor recreation facility
  5. Lighting for night use of facilities
  6. Market
  7. Motorsport track and associated activities
  8. Office ancillary to recreation facility
  9. Open space
  10. Outdoor sports courts
  11. Playground
  12. Racecourse and associated activities
  13. Recreation area
  14. Shop ancillary to recreation facility
  15. Showground and associated activities
  16. Special event
  17. Spectator viewing structure
  18. Sporting clubrooms
  19. Sporting ovals and fields
  20. Stadium
  21. Swimming pool
  22. Tourist accommodation ancillary to recreation facility
PO 1.2

Shops including restaurants are of a scale that is subordinate to the principal recreational use of land.

\n
DTS/DPF 1.2

Shop gross leasable floor area does not exceed 80m2.

\n
PO 1.3

Offices are of a scale that is subordinate to the principal recreational use of land.

\n
DTS/DPF 1.3

Office gross leasable floor area does not exceed 80m2.

\n
PO 1.4
Tourist accommodation of a scale that is subordinate to the principal recreational use of land.\n
DTS/DPF 1.4
None are applicable.\n
PO 1.5

Facilities capable of attracting larger numbers of spectators may include complementary activities associated with the principal recreational use of land, such as:

  1. Horse breeding, keeping, sales and training activities associated with a racecourse
  2. Storage and maintenance of racing vehicles associated with a motorsport track.
DTS/DPF 1.5
None are applicable.\n
PO 1.6
Facilities that may attract longer-term stays may include complementary activities associated with the principal recreational use of land, such as tourist accommodation.\n
DTS/DPF 1.6
None are applicable.\n
Built Form and Character
PO 2.1

Development includes building, landscape and streetscape design elements to achieve high visual amenity particularly along public roads and open spaces.

DTS/DPF 2.1

None are applicable.

PO 2.2

Buildings are designed and sited to manage visual impacts.

DTS/DPF 2.2

Buildings are set back:

  1. no closer to a public road than an existing building on an adjoining allotment, or 8m where no building exists on an adjoining site
  2. 8m from the boundary of an allotment containing, or zoned to primarily accommodate, a sensitive receiver in other ownership.
PO 2.3
Outbuildings are of a scale that manages visual impacts.\n
DTS/DPF 2.3

Outbuildings have a:

  1. floor area that does not exceed 80m2
  2. wall height that does not exceed 3m
  3. building height that does not exceed 5m
Interface Height
PO 3.1
Buildings mitigate the visual impacts of massing on residential development within a neighbourhood-type zone.\n
DTS/DPF 3.1

Buildings constructed within a building envelope provided by a 45 degree plane measured from a height of 3m above natural ground level at the boundary of an allotment used for residential purposes within a neighbourhood-type zone as shown in the following diagram (except where this boundary is a southern boundary or where this boundary is the street boundary):

PO 3.2
Buildings mitigate overshadowing of residential development within a neighbourhood-type zone.\n
DTS/DPF 3.2

Buildings on sites with a southern boundary adjoining the boundary of an allotment used for residential purposes within a neighbourhood-type zone are constructed within a building envelope provided by a 30 degree plane grading north measured from a height of 3m above natural ground level at the southern boundary, as shown in the following diagram (except where this boundary is a street boundary):

PO 3.3
Buildings on an allotment fronting a road that is not a State maintained road, and where land on the opposite side of the road is within a neighbourhood-type zone, provides an orderly transition to the built form scale envisaged in the adjacent zone to complement the streetscape character.
DTS/DPF 3.3
None are applicable.\n
Land Division
PO 4.1

Land division supports the provision of recreational facilities.

DTS/DPF 4.1

Land division is for the purposes of:

  1. the creation of a public road or a public reserve
    or
  2. a minor adjustment of allotment boundaries to remove an anomaly in existing boundaries with respect to the location of existing buildings or structures.
Concept Plans
PO 5.1
Development is compatible with the outcomes sought by any relevant Concept Plan contained within Part 12 - Concept Plans of the Planning and Design Code to support the orderly development of land\u00A0through staging of development and provision of infrastructure.\n
DTS/DPF 5.1

The site of the development is wholly located outside any relevant Concept Plan boundary. The following Concept Plans are relevant:

Description
Concept Plan 3 - Mount Barker and Littlehampton
Concept Plan 9 - Blakeview
Concept Plan 21 - Virginia
Concept Plan 81 - Edinburgh Defence Airfield Lighting Constraints
Concept Plan 80 - Murray Bridge
Concept Plan 99 - Two Wells
Concept Plan 98 - Mallala
Concept Plan 92 - Meadows
Concept Plan 101 - Evanston Gardens, Evanston South, Hillier
Concept Plan 100 - Gawler East
Concept Plan 175 - Smithfield Regeneration
Concept Plan 177 - Prospect Lifestyle Precinct

In relation to DTS/DPF 5.1, in instances where:

  1. one or more Concept Plan is returned, refer to Part 12 - Concept Plans in the Planning and Design Code to determine if a Concept Plan is relevant to the site of the proposed development. Note: multiple concept plans may be relevant.
  2. in instances where ‘no value’ is returned, there is no relevant concept plan and DTS/DPF 5.1 is met.
\u00A0
Advertisements
PO 6.1

Freestanding advertisements that identify the associated business without creating a visually dominant element within the locality.

DTS/DPF 6.1

Freestanding advertisements:

  1. do not exceed 2m in height
    and
  2. do not have a sign face that exceeds 2m2 per side.

\u00A0

Table 1 - Accepted Development Classification

Unless otherwise specified in another class of development, the reference to a class of development includes a reference to a change in the use of the relevant land or building work (including construction of a new building, or alteration/addition of an existing building).
\u00A0
The following table identifies Classes of Development that are classified as Accepted Development subject to meeting the Accepted Development Classification Criteria

Class of DevelopmentAccepted Development Classification Criteria
Brush fence
Except where any of the following apply:
  • Hazards (Flooding) Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • Ramsar Wetlands Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The fence is formed (wholly or partially) from brush
  2. \n
  3. The fence does not exceed 2.1m in height (measured from the lower of the 2 adjoining finished ground levels)
  4. \n
  5. The fence does not exceed 1m in height within 6m of the intersection of 2 boundaries of land where those boundaries both face a road, other than where a 4 x 4 m corner cut-off has already been provided (and is to be preserved)
  6. \n
  7. The development will not be located within the extents of the River Murray 1956 Flood Level as delineated by the SA Property and Planning Atlas.
  8. \n
\n
Building alterations
Except where any of the following apply:
  • Local Heritage Place Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The alteration does not:\n
      \n
    1. increase the floor area of the building
    2. \n
    3. exceed the existing wall height
    4. \n
    5. exceed the existing overall building height
    6. \n
    7. alter the roof profile
    8. \n
    9. alter an approved privacy screening arrangement or window treatment
    10. \n
    11. result in less on-site car parking than specified in Transport, Access and Parking Table 1 - General Off-Street Car Parking Requirements or Table 2 - Off-Street Car Parking Requirements in Designated Areas.
    12. \n
    \n
  2. \n
  3. Where located within the Historic Area Overlay, there will be no external alterations to the external appearance of the building where visible from the public realm.
  4. \n
\n
Building work on railway land\u00A0
Except where any of the following apply:
  • Coastal Areas Overlay
  • Hazards (Acid Sulfate Soils) Overlay
  • Local Heritage Place Overlay
  • Significant Landscape Protection Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. Building work is associated with a railway
  2. \n
  3. It is situated (or to be situated) on railway land (within the meaning of Schedule 4 clause 14 of the Planning, Development and Infrastructure (General) Regulations 2017)
  4. \n
  5. It is required for the conduct or maintenance of railway activities
  6. \n
  7. It does not involve the clearance of native vegetation
  8. \n
  9. The development will not be located within the extents of the River Murray 1956 Flood Level as delineated by the SA Property and Planning Atlas
  10. \n
  11. It does not involve the construction of a building that exceeds 3 building levels above the regulated surface level where located within the Tunnel Protection Overlay
  12. \n
  13. It does not involve filling of land more than 1m above the regulated surface level where located within the Tunnel Protection Overlay
  14. \n
  15. It does not include storage of materials, equipment or vehicles (whether temporary or permanent) over an area exceeding 100 square metres where located within the Tunnel Protection Overlay
  16. \n
  17. It does not include temporary stockpiling of soil, gravel, rock or other natural material over an area exceeding 100 square metres where located within the Tunnel Protection Overlay
  18. \n
  19. It does not involve excavation or ground intruding activity more than 2.5m below the regulated surface level where located within the Tunnel Protection Overlay.\n
     
    \n
  20. \n
\n
Outbuilding
Except where any of the following apply:
  • Coastal Areas Overlay
  • Future Local Road Widening Overlay
  • Future Road Widening Overlay
  • Hazards (Flooding) Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • Significant Landscape Protection Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The development will not be contrary to the regulations prescribed for the purposes of section 86 of the Electricity Act 1996
  2. \n
  3. The development will not be built, or encroach, on an area that is, or will be, required for a sewerage system or waste control system
  4. \n
  5. It is detached from and ancillary to a dwelling erected on the site.
  6. \n
  7. Primary street setback - at least 5.5m from the primary street boundary and as far back as the building line of the building to which it is ancillary
  8. \n
  9. Secondary street setback - at least 900mm from the boundary of the allotment (if the land has boundaries on two or more roads)
  10. \n
  11. Total floor area - does not exceed 40m2 
  12. \n
  13. Wall height - does not exceed 3m measured from natural ground level (and not including a gable end)
  14. \n
  15. Building height - does not exceed 5m
  16. \n
  17. If situated on or abutting a boundary (not being a boundary with a primary street or secondary street) - a length not exceeding 10m unless:\n
      \n
    1. a longer wall or structure exists on the adjacent site and is situated on the same allotment boundary; and
    2. \n
    3. the proposed wall or structure will be built along the same length of boundary as the existing adjacent wall or structure to the same or lesser extent
    4. \n
    \n
  18. \n
  19. If the outbuilding abuts or is situated on the boundary of the allotment (not being a boundary with a primary street or secondary street):\n
      \n
    1. it will not result in all relevant walls or structures located along the boundary exceeding 45% of the length of the boundary; and
    2. \n
    3. it will not be located within 3m of any other wall along the same boundary unless on an adjacent site on that boundary there is an existing wall of a building that would be adjacent to or abut the proposed wall or structure
    4. \n
    \n
  20. \n
  21. Total roofed area of all existing and proposed buildings on the allotment - does not exceed 60%
  22. \n
  23. If the outbuilding is a garage – door opening for vehicle access facing a street frontage – does not exceed, in total, 7m in width or 50% of the width of the allotment frontage (whichever lesser)
  24. \n
  25. If the outbuilding is a garage, it is located so that vehicle access:\n
      \n
    1. is provided via a lawfully existing or authorised driveway or access point or an access point for which consent has been granted as part of an application for the division of land; or
      \n
    2. \n
    3. is not located on a State maintained road, and will use a driveway that:
      \n
      \n
        \n
      1. is not located within 6m of an intersection of 2 or more roads or a pedestrian actuated crossing;
        \n
      2. \n
      3. will not interfere with an item of street furniture (including directional signs, lighting, seating and weather shelters), other infrastructure, or a tree;
        \n
      4. \n
      5. is located so that the gradient from the place of access on the boundary of the allotment to the finished floor level at the front of the carport when the work is completed is not steeper than 1:4 on average
        \n
      6. \n
      7. is aligned relative to the street so that there is no more than a 20 degree deviation from 90 degrees between the centreline of the driveway at the public road boundary and the centre of the front of the covered car parking space for which it provides vehicle access
        \n
      8. \n
      9. if located so as to provide access from an alley, lane or right of way - the alley, lane or right or way is at least 6.2m wide along the boundary of the allotment / site
        \n
      10. \n
      \n
    4. \n
    \n
  26. \n
  27. If clad in sheet metal-is pre-colour treated or painted in a non-reflective colour
    \n
  28. \n
  29. Does not involve-
    \n
    \n
      \n
    1. excavation exceeding a vertical height of 1m; or
    2. \n
    3. filling exceeding a vertical height of 1m,
    4. \n
    \n and, if the development involves both excavation and filling, the total combined excavation and filling must not exceed a vertical height of 2m.
  30. \n
  31. Does not involve the clearance of native vegetation
  32. \n
  33. The development will not be located within the extents of the River Murray 1956 Flood Level as delineated by the SA Property and Planning Atlas
  34. \n
  35. It does not involve excavation or ground intruding activity more than 2.5m below the regulated surface level where located within the Tunnel Protection Overlay.
  36. \n
\n
Partial demolition of a building or structure
Except where any of the following apply:
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
None\n
Protective tree netting structure
Except where any of the following apply:
  • Hazards (Flooding) Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • Ramsar Wetlands Overlay
  • Significant Landscape Protection Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The development will not be contrary to the regulations prescribed for the purposes of section 86 of the Electricity Act 1996
  2. \n
  3. The development will not be located within the extents of the River Murray 1956 Flood Level as delineated by the SA Property and Planning Atlas
  4. \n
  5. The development will not be built, or encroach, on an area that is, or will be, required for a sewerage system or waste control system
  6. \n
  7. No part of the protective tree netting structure will be more than 6m above natural ground level (depending on where it is situated)
  8. \n
  9. Netting visible from the outside of the protective tree netting structure is of a low light-reflective nature, and, in the case of a structure that has side netting, the side netting is of a dark colour
  10. \n
  11. In the case of a development on a site that is within a Hazards (Bushfire - Outback) Overlay, Hazards (Bushfire - Regional) Overlay, Hazards (Bushfire - General Risk) Overlay, Hazards (Bushfire Medium - Risk) Overlay or Hazards (Bushfire - High Risk) Overlay, the protective tree netting structure provides for access to the site in accordance with the following:\n
      \n
    1. no part of the protective tree netting structure (including cables and points of attachment of cables (known as 'auger' or 'anchor' points) will be within 5m of any boundary of the site; or
    2. \n
    3. does not prevent access or movement of vehicles of 4m height and 3.5m width (or less) on any access road or track (including fire tracks) on the site
    4. \n
    \n
  12. \n
  13. No part of the netting canopy of the protective tree netting structure:\n
      \n
    1. will cover native vegetation; or
    2. \n
    3. will be within 5m of a road (including any road reserve)
    4. \n
    \n
  14. \n
  15. The points of attachment of any cables will not be located:\n
      \n
    1. outside the boundaries of the site; or
    2. \n
    3. within a watercourse (within the meaning of the Landscape South Australia Act 2019)
    4. \n
    \n
  16. \n
  17. In relation to a dwelling located on an allotment adjoining the site on which the protective tree netting structure is located, the protective tree netting structure complies with the following:\n
      \n
    1. if the netting canopy nearest the dwelling on the adjoining allotment is 4m or less above ground level (depending on where it is situated), no part of the netting canopy is within 10m of the dwelling
    2. \n
    3. in any other case, no part of the netting canopy is within 15m of the dwelling
    4. \n
    \n
  18. \n
\n
Shade sail
Except where any of the following apply:
  • Future Local Road Widening Overlay
  • Future Road Widening Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The development will not be contrary to the regulations prescribed for the purposes of section 86 of the Electricity Act 1996
  2. \n
  3. The development will not be built, or encroach, on an area that is, or will be, required for a sewerage system or waste control system
  4. \n
  5. Shade sail consists of permeable material
  6. \n
  7. The total area of the sail - does not exceed 40m2
  8. \n
  9. No part of the shade sail will be:\n
      \n
    1. 3m above ground or floor level (depending on where it is situated) at any place within 900mm of a boundary of the allotment
    2. \n
    3. 5m above ground or floor level (depending on where it is situated) within any other part of the allotment
    4. \n
    \n
  10. \n
  11. Primary street setback - at least as far back as the building line of the building to which it is ancillary
  12. \n
  13. If any part of the sail will be situated on a boundary of the allotment, the length of sail along a boundary does not exceed 11m
  14. \n
  15. In a case where any part of the sail or a supporting structure will be situated on a side boundary of the allotment - the length of the sail and any such supporting structure together with all relevant walls or structures located along the boundary will not exceed 45% of the length of the boundary
  16. \n
  17. Does not involve the clearance of native vegetation
  18. \n
  19. The development will not be located within the extents of the River Murray 1956 Flood Level as delineated by the SA Property and Planning Atlas
  20. \n
  21. It does not involve filling of land more than 1m above the regulated surface level where located within the Tunnel Protection Overlay
  22. \n
  23. It does not involve excavation or ground intruding activity more than 2.5m below the regulated surface level where located within the Tunnel Protection Overlay.
  24. \n
\n
Solar photovoltaic panels (roof mounted)
Except where any of the following apply:
  • Local Heritage Place Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The development will not be contrary to the regulations prescribed for the purposes of section 86 of the Electricity Act 1996
  2. \n
  3. Panels are installed parallel to the roof of a building and with the underside surface of the panel not being more than 100mm above the surface of the roof
  4. \n
  5. Panels and associated components do not overhang any part of the roof
  6. \n
  7. Does not apply to system with a generating capacity of more than 5MW that is to be connected to the State's power system
  8. \n
  9. If the building is in a Historic Area Overlay-no part of the system, when installed, will be able to be seen by a person standing at ground level in a public street.
  10. \n
\n
Verandah
Except where any of the following apply:
  • Future Local Road Widening Overlay
  • Future Road Widening Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The development will not be contrary to the regulations prescribed for the purposes of section 86 of the Electricity Act 1996
  2. \n
  3. The development will not be built, or encroach, on an area that is, or will be, required for a sewerage system or waste control system
  4. \n
  5. It is ancillary to a dwelling erected on the site
  6. \n
  7. Primary street setback - as far back as the building line of the building to which it is ancillary
  8. \n
  9. Total floor area - does not exceed 40m2 
  10. \n
  11. Post height - does not exceed 3m measured from natural ground level
  12. \n
  13. Building height - does not exceed 5m
  14. \n
  15. Length - does not exceed 11m if any part of the structure abuts or is situated on a boundary of the allotment
  16. \n
  17. Total roofed area of all existing and proposed buildings on the allotment - does not exceed 60%
  18. \n
  19. Does not involve the clearance of native vegetation
  20. \n
  21. It does not involve filling of land more than 1m above the regulated surface level where located within the Tunnel Protection Overlay
  22. \n
  23. It does not involve excavation or ground intruding activity more than 2.5m below the regulated surface level where located within the Tunnel Protection Overlay.
  24. \n
\n
Water tank (above ground)
Except where any of the following apply:
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • Ramsar Wetlands Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
    \n
  1. The development will not be contrary to the regulations prescribed for the purposes of section 86 of the Electricity Act 1996
  2. \n
  3. The development will not be built, or encroach, on an area that is, or will be, required for a sewerage system or waste control system
  4. \n
  5. The tank is part of a roof drainage system
  6. \n
  7. Total floor area - not exceeding 15m2
  8. \n
  9. The tank is located wholly above ground
  10. \n
  11. Tank height - does not exceed 4m above natural ground level
  12. \n
  13. Primary street setback - at least as far back as the building line of the building to which it is ancillary
  14. \n
  15. In the case of a tank made of metal - the tank is pre-colour treated or painted in a non-reflective colour
  16. \n
  17. Does not involve the clearance of native vegetation
  18. \n
  19.  It does not involve filling of land more than 1m above the regulated surface level where located within the Tunnel Protection Overlay
  20. \n
  21. It does not involve excavation or ground intruding activity more than 2.5m below the regulated surface level where located within the Tunnel Protection Overlay.
  22. \n
\n
Water tank (underground)
Except where any of the following apply:
  • Coastal Areas Overlay
  • Hazards (Acid Sulfate Soils) Overlay
  • Ramsar Wetlands Overlay
    \n
  1. The development will not be built, or encroach, on an area that is, or will be, required for a sewerage system or waste control system
  2. \n
  3. The tank (including any associated pump) is located wholly below the level of the ground
  4. \n
  5. Does not involve the clearance of native vegetation
  6. \n
  7. It does not involve filling of land more than 1m above the regulated surface level where located within the Tunnel Protection Overlay
  8. \n
  9. It does not involve excavation or ground intruding activity more than 2.5m below the regulated surface level where located within the Tunnel Protection Overlay.
  10. \n
\n

\n
\u00A0

Table 2 - Deemed-to-Satisfy Development Classification

Unless otherwise specified in another class of development, the reference to a class of development includes a reference to a change in the use of the relevant land or building work (including construction of a new building, or alteration/addition of an existing building).
\u00A0
The following table identifies Classes of Development that are classified as Deemed-to-Satisfy Development subject to meeting the ‘Deemed-to-Satisfy Development Classification Criteria’. Provisions referred to in the table are Deemed-to-Satisfy Criteria. Where a development comprises more than one Class of Development the relevant criteria will be taken to be the sum of the criteria for each Class of Development.

Class of DevelopmentDeemed-to-Satisfy Development Classification Criteria
ZoneGeneral Development PoliciesSubzone
(applies only in the area affected by the Subzone)
Overlay
(applies only in the area affected by the Overlay)
Advertisement
Except where any of the following apply:
  • Character Preservation District Overlay
  • Heritage Adjacency Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • Non-stop Corridor Overlay
  • Significant Landscape Protection Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
NoneAdvertisements [Appearance]
DTS/DPF 1.1, DTS/DPF 1.2, DTS/DPF 1.3, DTS/DPF 1.4

Advertisements [Proliferation of Advertisements]
DTS/DPF 2.3

Advertisements [Advertising Content]
DTS/DPF 3.1

Advertisements [Amenity Impacts]
DTS/DPF 4.1

Advertisements [Safety]
DTS/DPF 5.1, DTS/DPF 5.2, DTS/DPF 5.3, DTS/DPF 5.4, DTS/DPF 5.5, DTS/DPF 5.6

Clearance from Overhead Powerlines
DTS/DPF 1.1

Infrastructure and Renewable Energy Facilities [Wastewater Services]
DTS/DPF 12.2
NoneAdvertising Near Signalised Intersections Overlay [Advertisements Near Signalised Intersections]
DTS/DPF 1.1

Airport Building Heights (Aircraft Landing Areas) Overlay [Built Form]
DTS/DPF 1.1

Airport Building Heights (Regulated) Overlay [Built Form]
DTS/DPF 1.1

Building Near Airfields Overlay
DTS/DPF 1.3

Defence Aviation Area Overlay [Built Form]
DTS/DPF 1.1

Future Road Widening Overlay [Future Road Widening]
DTS/DPF 1.1

Gateway Overlay [Advertisements]
DTS/DPF 4.1

Native Vegetation Overlay [Environmental Protection]
DTS/DPF 1.1

State Significant Native Vegetation Areas Overlay [Environmental Protection]
DTS/DPF 1.1

Tunnel Protection Overlay [Land Use and Intensity]
DTS/DPF 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
DTS/DPF 2.1
Outbuilding
Except where any of the following apply:
  • Hazards (Flooding) Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • Non-stop Corridor Overlay
  • Significant Landscape Protection Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
Built Form and Character
DTS/DPF 2.2, DTS/DPF 2.3
Clearance from Overhead Powerlines
DTS/DPF 1.1

Design [All development [Earthworks and sloping land]]
DTS/DPF 8.1

Design [All residential development and non-residential development [Ancillary Development]]
DTS/DPF 13.1, DTS/DPF 13.2, DTS/DPF 13.3

Design [All residential development and non-residential development [Car parking, access and manoeuvrability]]
DTS/DPF 19.1, DTS/DPF 19.3, DTS/DPF 19.4, DTS/DPF 19.5

Infrastructure and Renewable Energy Facilities [Wastewater Services]
DTS/DPF 12.2
NoneAirport Building Heights (Aircraft Landing Areas) Overlay [Built Form]
DTS/DPF 1.1

Airport Building Heights (Regulated) Overlay [Built Form]
DTS/DPF 1.1

Building Near Airfields Overlay
DTS/DPF 1.3

Defence Aviation Area Overlay [Built Form]
DTS/DPF 1.1

Future Local Road Widening Overlay [Future Road Widening]
DTS/DPF 1.1

Future Road Widening Overlay [Future Road Widening]
DTS/DPF 1.1

Gateway Overlay [Landscape Amenity]
DTS/DPF 2.1

Hazards (Bushfire - General Risk) Overlay [Built Form]
DTS/DPF 2.2

Hazards (Bushfire - High Risk) Overlay [Built Form]
DTS/DPF 3.2

Hazards (Bushfire - Medium Risk) Overlay [Built Form]
DTS/DPF 2.2

Hazards (Bushfire - Regional) Overlay [Built Form]
DTS/DPF 2.2

Hazards (Flooding) Overlay [Flood Resilience]
DTS/DPF 3.5

Historic Shipwrecks Overlay [General]
DTS/DPF 1.1

Key Outback and Rural Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
DTS/DPF 1.1

Key Outback and Rural Routes Overlay [Access - On-Site Queuing]
DTS/DPF 2.1

Key Outback and Rural Routes Overlay [Access - Location (Spacing) - Existing Access Points]
DTS/DPF 3.1

Key Outback and Rural Routes Overlay [Access - Location (Spacing) - New Access Points]
DTS/DPF 4.1

Key Outback and Rural Routes Overlay [Access - Location (Sight Lines)]
DTS/DPF 5.1

Key Outback and Rural Routes Overlay [Access - Mud and Debris]
DTS/DPF 6.1

Key Outback and Rural Routes Overlay [Access - Stormwater]
DTS/DPF 7.1

Key Outback and Rural Routes Overlay [Building on Road Reserve]
DTS/DPF 8.1

Key Outback and Rural Routes Overlay [Public Road Junctions]
DTS/DPF 9.1

Key Railway Crossings Overlay [Access, Design and Function]
DTS/DPF 1.1

Major Urban Transport Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
DTS/DPF 1.1

Major Urban Transport Routes Overlay [Access - On-Site Queuing]
DTS/DPF 2.1

Major Urban Transport Routes Overlay [Access – Location (Spacing) - Existing Access Points]
DTS/DPF 3.1

Major Urban Transport Routes Overlay [Access – Location (Spacing) – New Access Points]
DTS/DPF 4.1

Major Urban Transport Routes Overlay [Access - Location (Sight Lines)]
DTS/DPF 5.1

Major Urban Transport Routes Overlay [Access - Mud and Debris]
DTS/DPF 6.1

Major Urban Transport Routes Overlay [Access - Stormwater]
DTS/DPF 7.1

Major Urban Transport Routes Overlay [Building on Road Reserve]
DTS/DPF 8.1

Major Urban Transport Routes Overlay [Public Road Junctions]
DTS/DPF 9.1

Major Urban Transport Routes Overlay [Corner Cut-Offs]
DTS/DPF 10.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Stormwater]
DTS/DPF 3.4, DTS/DPF 3.9

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Stormwater]
DTS/DPF 3.4, DTS/DPF 3.9

Native Vegetation Overlay [Environmental Protection]
DTS/DPF 1.1

River Murray Flood Plain Protection Area Overlay [Flood Resilience]
DTS/DPF 6.4

Scenic Quality Overlay [Earthworks]
DTS/DPF 4.1

State Significant Native Vegetation Areas Overlay [Environmental Protection]
DTS/DPF 1.1

Tunnel Protection Overlay [Land Use and Intensity]
DTS/DPF 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
DTS/DPF 2.1

Urban Transport Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
DTS/DPF 1.1

Urban Transport Routes Overlay [Access - On-Site Queuing]
DTS/DPF 2.1

Urban Transport Routes Overlay [Access - (Location Spacing) - Existing Access Point]
DTS/DPF 3.1

Urban Transport Routes Overlay [Access – Location (Spacing) – New Access Points]
DTS/DPF 4.1

Urban Transport Routes Overlay [Access - Location (Sight Lines)]
DTS/DPF 5.1

Urban Transport Routes Overlay [Access - Stormwater]
DTS/DPF 7.1

Urban Transport Routes Overlay [Building on Road Reserve]
DTS/DPF 8.1

Urban Transport Routes Overlay [Public Road Junctions]
DTS/DPF 9.1

Urban Transport Routes Overlay [Corner Cut-Offs]
DTS/DPF 10.1

Water Resources Overlay [Water Catchment]
DTS/DPF 1.5
Replacement building
Except where any of the following apply:
  • Coastal Areas Overlay
  • Coastal Flooding Overlay
  • Hazards (Bushfire - High Risk) Overlay
  • Hazards (Bushfire - Medium Risk) Overlay
  • Hazards (Flooding - General) Overlay
  • Hazards (Flooding) Overlay
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • River Murray Flood Plain Protection Area Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
None None NoneTunnel Protection Overlay [Land Use and Intensity]
DTS/DPF 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
DTS/DPF 2.1
Temporary accommodation in an area affected by bushfire \u00A0 None None NoneTunnel Protection Overlay [Land Use and Intensity]
DTS/DPF 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
DTS/DPF 2.1
Verandah
Except where any of the following apply:
  • Historic Area Overlay
  • Local Heritage Place Overlay
  • Significant Landscape Protection Overlay
  • State Heritage Area Overlay
  • State Heritage Place Overlay
Built Form and Character
DTS/DPF 2.2, DTS/DPF 2.3
Clearance from Overhead Powerlines
DTS/DPF 1.1

Design [All development [Earthworks and sloping land]]
DTS/DPF 8.1

Design [All residential development and non-residential development [Ancillary Development]]
DTS/DPF 13.1, DTS/DPF 13.2, DTS/DPF 13.3

Infrastructure and Renewable Energy Facilities [Wastewater Services]
DTS/DPF 12.2
NoneAirport Building Heights (Aircraft Landing Areas) Overlay [Built Form]
DTS/DPF 1.1

Airport Building Heights (Regulated) Overlay [Built Form]
DTS/DPF 1.1

Building Near Airfields Overlay
DTS/DPF 1.3

Defence Aviation Area Overlay [Built Form]
DTS/DPF 1.1

Future Local Road Widening Overlay [Future Road Widening]
DTS/DPF 1.1

Future Road Widening Overlay [Future Road Widening]
DTS/DPF 1.1

Gateway Overlay [Landscape Amenity]
DTS/DPF 2.1

Hazards (Flooding) Overlay [Flood Resilience]
DTS/DPF 3.5

Historic Shipwrecks Overlay [General]
DTS/DPF 1.1

Key Railway Crossings Overlay [Access, Design and Function]
DTS/DPF 1.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Stormwater]
DTS/DPF 3.4, DTS/DPF 3.9

Native Vegetation Overlay [Environmental Protection]
DTS/DPF 1.1

Scenic Quality Overlay [Earthworks]
DTS/DPF 4.1

State Significant Native Vegetation Areas Overlay [Environmental Protection]
DTS/DPF 1.1

Tunnel Protection Overlay [Land Use and Intensity]
DTS/DPF 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
DTS/DPF 2.1

Water Resources Overlay [Water Catchment]
DTS/DPF 1.5
\u00A0

Table 3 - Applicable Policies for Performance Assessed Development

\u00A0\n
\u00A0
The following table identifies the policies that are applicable to the assessment of the identified Class of Development to the exclusion of all other policies within the Code. Policies referred to are Performance Outcome policies, and any associated Designated Performance Features. Relevant Desired Outcomes are not listed, but automatically apply in relation to a Performance Assessed Development. Where a development comprises more than one Class of Development the relevant policies will be taken to be the sum of the applicable policies for each Class of Development.

In the case of 'All Other Code Assessed Development', all policies from the zone subzone and overlays that have application to the spatial location of the development, and all general development policies, apply for the purpose of assessment.

Unless otherwise specified in another class of development, the reference to a class of development includes a reference to a change in the use of the relevant land or building work (including construction of a new building, or alteration/addition of an existing building).

Class of DevelopmentApplicable Policies
ZoneGeneral Development PoliciesSubzone
(applies only in the area affected by the Subzone)
Overlay
(applies only in the area affected by the Overlay)
Advertisement \u00A0Advertisements
PO 6.1
Advertisements [Appearance]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5

Advertisements [Proliferation of Advertisements]
PO 2.1, PO 2.2, PO 2.3

Advertisements [Advertising Content]
PO 3.1

Advertisements [Amenity Impacts]
PO 4.1

Advertisements [Safety]
PO 5.1, PO 5.2, PO 5.3, PO 5.4, PO 5.5, PO 5.6

Clearance from Overhead Powerlines
PO 1.1

Infrastructure and Renewable Energy Facilities [Wastewater Services]
PO 12.2
NoneAdvertising Near Signalised Intersections Overlay [Advertisements Near Signalised Intersections]
PO 1.1

Airport Building Heights (Aircraft Landing Areas) Overlay [Built Form]
PO 1.1

Airport Building Heights (Regulated) Overlay [Built Form]
PO 1.1

Building Near Airfields Overlay
PO 1.3

Character Area Overlay [All Development]
PO 1.1

Character Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.5

Character Area Overlay [Ancillary Development]
PO 4.3

Character Area Overlay [Context and Streetscape Amenity]
PO 6.2

Character Preservation District Overlay [Built Form and Character]
PO 2.1, PO 2.2, PO 2.3

Character Preservation District Overlay [Built Form and Character in the Rural Area]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.5

Character Preservation District Overlay [Earthworks]
PO 4.1

Coastal Flooding Overlay
PO 1.1

Defence Aviation Area Overlay [Built Form]
PO 1.1

Future Local Road Widening Overlay [Future Road Widening]
PO 1.1

Future Road Widening Overlay [Future Road Widening]
PO 1.1

Gateway Overlay [Advertisements]
PO 4.1

Hazards (Flooding) Overlay [Flood Resilience]
PO 3.1, PO 3.2, PO 3.3

Hazards (Flooding) Overlay [Environmental Protection]
PO 4.2

Heritage Adjacency Overlay [Built Form]
PO 1.1

Historic Area Overlay [All Development]
PO 1.1

Historic Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.3, PO 2.5

Historic Area Overlay [Ancillary development]
PO 4.3

Historic Area Overlay [Context and Streetscape Amenity]
PO 6.2

Historic Area Overlay [Ruins]
PO 8.1

Local Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6, PO 1.7

Local Heritage Place Overlay [Alterations and Additions]
PO 2.1, PO 2.2

Local Heritage Place Overlay [Ancillary Development]
PO 3.3

Native Vegetation Overlay [Environmental Protection]
PO 1.1, PO 1.2, PO 1.4

Non-Stop Corridors Overlay [Non-Stop Corridor Overlay]
PO 1.1

Scenic Quality Overlay [Land Use and Intensity]
PO 1.1

Scenic Quality Overlay [Built Form and Character]
PO 2.1

Significant Landscape Protection Overlay [Land Use and Intensity]
PO 1.1

Significant Landscape Protection Overlay [Built Form and Character]
PO 2.1, PO 2.2

Significant Landscape Protection Overlay [Landscaping]
PO 3.1

Significant Landscape Protection Overlay [Earthworks]
PO 4.1

State Heritage Area Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5

State Heritage Area Overlay [Ancillary Development]
PO 3.3

State Heritage Area Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6

State Heritage Place Overlay [Ancillary Development]
PO 3.3

State Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Significant Native Vegetation Areas Overlay [Environmental Protection]
PO 1.1

Tunnel Protection Overlay [Land Use and Intensity]
PO 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
PO 2.1
Demolition \u00A0 None None NoneHistoric Area Overlay [All Development]
PO 1.1

Historic Area Overlay [Demolition]
PO 7.1, PO 7.2, PO 7.3

Historic Area Overlay [Ruins]
PO 8.1

Local Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

Local Heritage Place Overlay [Demolition]
PO 6.1, PO 6.2

Local Heritage Place Overlay [Conservation Works]
PO 7.1

State Heritage Area Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Area Overlay [Demolition]
PO 6.1

State Heritage Area Overlay [Conservation Works]
PO 7.1

State Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Place Overlay [Demolition]
PO 6.1

State Heritage Place Overlay [Conservation Works]
PO 7.1
Outbuilding \u00A0Built Form and Character
PO 2.2, PO 2.3
Clearance from Overhead Powerlines
PO 1.1

Design [All development [Earthworks and sloping land]]
PO 8.1, PO 8.2, PO 8.3, PO 8.4

Design [All residential development and non-residential development [Ancillary Development]]
PO 13.1, PO 13.2, PO 13.3

Design [All residential development and non-residential development [Car parking, access and manoeuvrability]]
PO 19.1, PO 19.3, PO 19.4, PO 19.5

Infrastructure and Renewable Energy Facilities [Wastewater Services]
PO 12.2
Adelaide Showgrounds Subzone [Land Use and Intensity]
PO 1.2

Adelaide Showgrounds Subzone [Built Form and Character]
PO 2.1, PO 2.2, PO 2.3
Airport Building Heights (Aircraft Landing Areas) Overlay [Built Form]
PO 1.1

Airport Building Heights (Regulated) Overlay [Built Form]
PO 1.1

Building Near Airfields Overlay
PO 1.3

Character Area Overlay [All Development]
PO 1.1

Character Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Character Area Overlay [Ancillary Development]
PO 4.1, PO 4.2

Character Area Overlay [Context and Streetscape Amenity]
PO 6.1, PO 6.2

Character Preservation District Overlay [Built Form and Character]
PO 2.1, PO 2.2

Character Preservation District Overlay [Built Form and Character in the Rural Area]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.5, PO 3.6

Character Preservation District Overlay [Earthworks]
PO 4.1

Coastal Areas Overlay [Hazard Risk Minimisation]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Coastal Areas Overlay [Coast Protection Works]
PO 3.1, PO 3.2

Coastal Areas Overlay [Environment Protection]
PO 4.1, PO 4.2, PO 4.3, PO 4.4, PO 4.6, PO 4.7

Coastal Areas Overlay [Access]
PO 5.1, PO 5.2, PO 5.4

Coastal Flooding Overlay
PO 1.1

Defence Aviation Area Overlay [Built Form]
PO 1.1

Future Local Road Widening Overlay [Future Road Widening]
PO 1.1

Future Road Widening Overlay [Future Road Widening]
PO 1.1

Gateway Overlay [Built Form and Character]
PO 1.1, PO 1.2

Gateway Overlay [Landscape Amenity]
PO 2.1

Gateway Overlay [Landscaping]
PO 3.1, PO 3.2, PO 3.3, PO 3.4

Hazards (Acid Sulfate Soils) Overlay [Land Use and Intensity]
PO 1.1

Hazards (Bushfire - General Risk) Overlay [Siting]
PO 1.1

Hazards (Bushfire - General Risk) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - General Risk) Overlay [Vehicle Access – Roads, Driveways and Fire Tracks]
PO 5.2, PO 5.3

Hazards (Bushfire - High Risk) Overlay [Land Use]
PO 1.1

Hazards (Bushfire - High Risk) Overlay [Siting]
PO 2.1

Hazards (Bushfire - High Risk) Overlay [Built Form]
PO 3.1, PO 3.2

Hazards (Bushfire - High Risk) Overlay [Vehicle Access –Roads, Driveways and Fire Tracks]
PO 6.2, PO 6.3

Hazards (Bushfire - Medium Risk) Overlay [Siting]
PO 1.1

Hazards (Bushfire - Medium Risk) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - Medium Risk) Overlay [Vehicle Access - Roads, Driveways and Fire Tracks]
PO 5.2, PO 5.3

Hazards (Bushfire - Outback) Overlay [Vehicle Access - Roads and Driveways]
PO 2.2

Hazards (Bushfire - Regional) Overlay [Siting]
PO 1.1

Hazards (Bushfire - Regional) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - Regional) Overlay [Vehicle Access -Roads and Driveways]
PO 5.2, PO 5.3

Hazards (Flooding) Overlay [Flood Resilience]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.5

Hazards (Flooding) Overlay [Environmental Protection]
PO 4.1, PO 4.2

Hazards (Flooding) Overlay [Site Earthworks]
PO 5.1, PO 5.2

Hazards (Flooding) Overlay [Access]
PO 6.1, PO 6.2

Heritage Adjacency Overlay [Built Form]
PO 1.1

Historic Area Overlay [All Development]
PO 1.1

Historic Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Historic Area Overlay [Ancillary development]
PO 4.1, PO 4.2

Historic Area Overlay [Context and Streetscape Amenity]
PO 6.1, PO 6.2

Historic Area Overlay [Ruins]
PO 8.1

Historic Shipwrecks Overlay [General]
PO 1.1

Key Outback and Rural Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
PO 1.1

Key Outback and Rural Routes Overlay [Access - On-Site Queuing]
PO 2.1

Key Outback and Rural Routes Overlay [Access - Location (Spacing) - Existing Access Points]
PO 3.1

Key Outback and Rural Routes Overlay [Access - Location (Spacing) - New Access Points]
PO 4.1

Key Outback and Rural Routes Overlay [Access - Location (Sight Lines)]
PO 5.1

Key Outback and Rural Routes Overlay [Access - Mud and Debris]
PO 6.1

Key Outback and Rural Routes Overlay [Access - Stormwater]
PO 7.1

Key Outback and Rural Routes Overlay [Building on Road Reserve]
PO 8.1

Key Outback and Rural Routes Overlay [Public Road Junctions]
PO 9.1

Key Railway Crossings Overlay [Access, Design and Function]
PO 1.1

Local Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6, PO 1.7

Local Heritage Place Overlay [Ancillary Development]
PO 3.1, PO 3.2

Local Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

Local Heritage Place Overlay [Conservation Works]
PO 7.1

Major Urban Transport Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
PO 1.1

Major Urban Transport Routes Overlay [Access - On-Site Queuing]
PO 2.1

Major Urban Transport Routes Overlay [Access – Location (Spacing) - Existing Access Points]
PO 3.1

Major Urban Transport Routes Overlay [Access – Location (Spacing) – New Access Points]
PO 4.1

Major Urban Transport Routes Overlay [Access - Location (Sight Lines)]
PO 5.1

Major Urban Transport Routes Overlay [Access - Mud and Debris]
PO 6.1

Major Urban Transport Routes Overlay [Access - Stormwater]
PO 7.1

Major Urban Transport Routes Overlay [Building on Road Reserve]
PO 8.1

Major Urban Transport Routes Overlay [Public Road Junctions]
PO 9.1

Major Urban Transport Routes Overlay [Corner Cut-Offs]
PO 10.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Water Quality]
PO 1.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Stormwater]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Landscapes and Natural Features]
PO 4.1

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Water Quality]
PO 1.1

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Stormwater]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Landscapes and Natural Features]
PO 4.1

Native Vegetation Overlay [Environmental Protection]
PO 1.1, PO 1.2, PO 1.4

Non-Stop Corridors Overlay [Non-Stop Corridor Overlay]
PO 1.1

River Murray Flood Plain Protection Area Overlay [Wastewater]
PO 2.1

River Murray Flood Plain Protection Area Overlay [Built Form and Character]
PO 5.1, PO 5.2, PO 5.3, PO 5.4

River Murray Flood Plain Protection Area Overlay [Flood Resilience]
PO 6.1, PO 6.3, PO 6.4

River Murray Flood Plain Protection Area Overlay [Environmental Protection]
PO 7.1, PO 7.2, PO 7.3, PO 7.4

River Murray Flood Plain Protection Area Overlay [Access]
PO 8.1, PO 8.2, PO 8.3

Scenic Quality Overlay [Land Use and Intensity]
PO 1.1

Scenic Quality Overlay [Built Form and Character]
PO 2.1

Scenic Quality Overlay [Earthworks]
PO 4.1

Significant Landscape Protection Overlay [Built Form and Character]
PO 2.1, PO 2.2

Significant Landscape Protection Overlay [Landscaping]
PO 3.1

Significant Landscape Protection Overlay [Earthworks]
PO 4.1

State Heritage Area Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5

State Heritage Area Overlay [Ancillary Development]
PO 3.1, PO 3.2

State Heritage Area Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Area Overlay [Conservation Works]
PO 7.1

State Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6, PO 1.7

State Heritage Place Overlay [Ancillary Development]
PO 3.1, PO 3.2

State Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Place Overlay [Conservation Works]
PO 7.1

State Significant Native Vegetation Areas Overlay [Environmental Protection]
PO 1.1

Tunnel Protection Overlay [Land Use and Intensity]
PO 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
PO 2.1

Urban Transport Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
PO 1.1

Urban Transport Routes Overlay [Access - On-Site Queuing]
PO 2.1

Urban Transport Routes Overlay [Access - (Location Spacing) - Existing Access Point]
PO 3.1

Urban Transport Routes Overlay [Access – Location (Spacing) – New Access Points]
PO 4.1

Urban Transport Routes Overlay [Access - Location (Sight Lines)]
PO 5.1

Urban Transport Routes Overlay [Access – Mud and Debris]
PO 6.1

Urban Transport Routes Overlay [Access - Stormwater]
PO 7.1

Urban Transport Routes Overlay [Building on Road Reserve]
PO 8.1

Urban Transport Routes Overlay [Public Road Junctions]
PO 9.1

Urban Transport Routes Overlay [Corner Cut-Offs]
PO 10.1

Water Resources Overlay [Water Catchment]
PO 1.1, PO 1.2, PO 1.5, PO 1.6, PO 1.7, PO 1.8
Retaining wall \u00A0 NoneDesign [All development [Fences and Walls]]
PO 9.1, PO 9.2
NoneCharacter Area Overlay [All Development]
PO 1.1

Character Area Overlay [Built Form]
PO 2.1, PO 2.5

Coastal Areas Overlay [Hazard Risk Minimisation]
PO 2.3, PO 2.4

Coastal Areas Overlay [Coast Protection Works]
PO 3.1, PO 3.2, PO 3.3

Coastal Areas Overlay [Environment Protection]
PO 4.2, PO 4.3, PO 4.7

Coastal Flooding Overlay
PO 1.1

Future Road Widening Overlay [Future Road Widening]
PO 1.1

Hazards (Acid Sulfate Soils) Overlay [Land Use and Intensity]
PO 1.1

Hazards (Flooding) Overlay [Site Earthworks]
PO 5.1, PO 5.2

Historic Area Overlay [All Development]
PO 1.1

Historic Area Overlay [Built Form]
PO 2.1, PO 2.5

Local Heritage Place Overlay [Built Form]
PO 1.1, PO 1.5

Marine Parks (Managed Use) Overlay [Land Use]
PO 1.1

Marine Parks (Restricted Use) Overlay [Land Use]
PO 1.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Stormwater]
PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Landscapes and Natural Features]
PO 4.1

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Stormwater]
PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Landscapes and Natural Features]
PO 4.1

Native Vegetation Overlay [Environmental Protection]
PO 1.1, PO 1.2, PO 1.4

Ramsar Wetlands Overlay [General]
PO 1.1, PO 1.2, PO 1.3, PO 1.4

Regulated and Significant Tree Overlay [Land Division]
PO 3.1

River Murray Flood Plain Protection Area Overlay [Built Form and Character]
PO 5.4

River Murray Tributaries Protection Area Overlay [Land Use]
PO 1.1

Scenic Quality Overlay [Land Use and Intensity]
PO 1.1

Scenic Quality Overlay [Built Form and Character]
PO 2.1

Significant Landscape Protection Overlay [Earthworks]
PO 4.1

State Heritage Area Overlay [Built Form]
PO 1.1, PO 1.5

State Heritage Place Overlay [Built Form]
PO 1.1, PO 1.5

State Significant Native Vegetation Areas Overlay [Environmental Protection]
PO 1.1

Tunnel Protection Overlay [Land Use and Intensity]
PO 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
PO 2.1

Urban Transport Routes Overlay [Public Road Junctions]
PO 9.1

Water Resources Overlay [Water Catchment]
PO 1.1, PO 1.5, PO 1.7, PO 1.8
Shop \u00A0Land Use and Intensity
PO 1.1, PO 1.2

Built Form and Character
PO 2.1, PO 2.2

Interface Height
PO 3.1, PO 3.2, PO 3.3

Concept Plans
PO 5.1
Clearance from Overhead Powerlines
PO 1.1

Design [All development [External Appearance]]
PO 1.4, PO 1.5

Design [All development [On-site Waste Treatment Systems]]
PO 6.1

Design [All development [Carparking Appearance]]
PO 7.1, PO 7.2, PO 7.3, PO 7.4, PO 7.5, PO 7.6, PO 7.7

Infrastructure and Renewable Energy Facilities [Water Supply]
PO 11.1

Infrastructure and Renewable Energy Facilities [Wastewater Services]
PO 12.1, PO 12.2

Interface between Land Uses [Hours of Operation]
PO 2.1

Interface between Land Uses [Activities Generating Noise or Vibration]
PO 4.1, PO 4.2, PO 4.5, PO 4.6

Interface between Land Uses [Air Quality]
PO 5.2

Interface between Land Uses [Light Spill]
PO 6.1

Out of Activity Centre Development
PO 1.1, PO 1.2

Transport, Access and Parking [Movement Systems]
PO 1.4

Transport, Access and Parking [Vehicle Access]
PO 3.1, PO 3.5

Transport, Access and Parking [Access for People with Disabilities]
PO 4.1

Transport, Access and Parking [Vehicle Parking Rates]
PO 5.1

Transport, Access and Parking [Vehicle Parking Areas]
PO 6.1, PO 6.6

Transport, Access and Parking [Corner Cut-Offs]
PO 10.1
Adelaide Showgrounds Subzone [Land Use and Intensity]
PO 1.1, PO 1.2, PO 1.3

Adelaide Showgrounds Subzone [Built Form and Character]
PO 2.1, PO 2.2, PO 2.3
Airport Building Heights (Aircraft Landing Areas) Overlay [Built Form]
PO 1.1

Airport Building Heights (Regulated) Overlay [Built Form]
PO 1.1

Building Near Airfields Overlay
PO 1.1, PO 1.2, PO 1.3

Character Area Overlay [All Development]
PO 1.1

Character Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Character Area Overlay [Alterations and Additions]
PO 3.1

Character Area Overlay [Context and Streetscape Amenity]
PO 6.1, PO 6.2

Character Preservation District Overlay [Built Form and Character]
PO 2.1, PO 2.2, PO 2.3

Character Preservation District Overlay [Built Form and Character in the Rural Area]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.5, PO 3.6

Character Preservation District Overlay [Earthworks]
PO 4.1

Coastal Areas Overlay [Hazard Risk Minimisation]
PO 2.1, PO 2.2, PO 2.3, PO 2.4

Coastal Areas Overlay [Coast Protection Works]
PO 3.1, PO 3.2

Coastal Areas Overlay [Environment Protection]
PO 4.1, PO 4.2, PO 4.3, PO 4.4, PO 4.5, PO 4.6, PO 4.7

Coastal Areas Overlay [Access]
PO 5.1, PO 5.2, PO 5.4

Coastal Flooding Overlay
PO 1.1

Defence Aviation Area Overlay [Built Form]
PO 1.1, PO 1.2

Future Local Road Widening Overlay [Future Road Widening]
PO 1.1

Future Road Widening Overlay [Future Road Widening]
PO 1.1

Gas and Liquid Petroleum Pipelines Overlay [Land Use and Intensity]
PO 1.1

Gas and Liquid Petroleum Pipelines (Facilities) Overlay [Safety]
PO 1.1

Gateway Overlay [Built Form and Character]
PO 1.1, PO 1.2, PO 1.3

Gateway Overlay [Landscaping]
PO 3.1, PO 3.2, PO 3.3, PO 3.4

Hazards (Acid Sulfate Soils) Overlay [Land Use and Intensity]
PO 1.1

Hazards (Bushfire - General Risk) Overlay [Siting]
PO 1.1

Hazards (Bushfire - General Risk) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - General Risk) Overlay [Vehicle Access – Roads, Driveways and Fire Tracks]
PO 5.1, PO 5.2, PO 5.3

Hazards (Bushfire - High Risk) Overlay [Land Use]
PO 1.1

Hazards (Bushfire - High Risk) Overlay [Siting]
PO 2.1

Hazards (Bushfire - High Risk) Overlay [Built Form]
PO 3.1, PO 3.2

Hazards (Bushfire - High Risk) Overlay [Vehicle Access –Roads, Driveways and Fire Tracks]
PO 6.1, PO 6.2, PO 6.3

Hazards (Bushfire - Medium Risk) Overlay [Siting]
PO 1.1

Hazards (Bushfire - Medium Risk) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - Medium Risk) Overlay [Vehicle Access - Roads, Driveways and Fire Tracks]
PO 5.1, PO 5.2, PO 5.3

Hazards (Bushfire - Outback) Overlay [Vehicle Access - Roads and Driveways]
PO 2.1, PO 2.2

Hazards (Bushfire - Regional) Overlay [Siting]
PO 1.1

Hazards (Bushfire - Regional) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - Regional) Overlay [Vehicle Access -Roads and Driveways]
PO 5.1, PO 5.2, PO 5.3

Hazards (Flooding) Overlay [Flood Resilience]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.5

Hazards (Flooding) Overlay [Environmental Protection]
PO 4.1, PO 4.2

Hazards (Flooding) Overlay [Site Earthworks]
PO 5.1, PO 5.2

Hazards (Flooding) Overlay [Access]
PO 6.1, PO 6.2

Hazards (Flooding – General) Overlay [Flood Resilience]
PO 2.1

Hazards (Flooding – General) Overlay [Environmental Protection]
PO 3.1

Hazards (Flooding - Evidence Required) Overlay [Flood Resilience]
PO 1.1

Heritage Adjacency Overlay [Built Form]
PO 1.1

Historic Area Overlay [All Development]
PO 1.1

Historic Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Historic Area Overlay [Context and Streetscape Amenity]
PO 6.1, PO 6.2

Historic Area Overlay [Ruins]
PO 8.1

Historic Shipwrecks Overlay [General]
PO 1.1

Key Outback and Rural Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
PO 1.1

Key Outback and Rural Routes Overlay [Access - On-Site Queuing]
PO 2.1

Key Outback and Rural Routes Overlay [Access - Location (Spacing) - Existing Access Points]
PO 3.1

Key Outback and Rural Routes Overlay [Access - Location (Spacing) - New Access Points]
PO 4.1

Key Outback and Rural Routes Overlay [Access - Location (Sight Lines)]
PO 5.1

Key Outback and Rural Routes Overlay [Access - Mud and Debris]
PO 6.1

Key Outback and Rural Routes Overlay [Access - Stormwater]
PO 7.1

Key Outback and Rural Routes Overlay [Building on Road Reserve]
PO 8.1

Key Outback and Rural Routes Overlay [Public Road Junctions]
PO 9.1

Key Railway Crossings Overlay [Access, Design and Function]
PO 1.1

Limited Dwelling Overlay
PO 1.1

Local Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6, PO 1.7

Local Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

Local Heritage Place Overlay [Conservation Works]
PO 7.1

Major Urban Transport Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
PO 1.1

Major Urban Transport Routes Overlay [Access - On-Site Queuing]
PO 2.1

Major Urban Transport Routes Overlay [Access – Location (Spacing) - Existing Access Points]
PO 3.1

Major Urban Transport Routes Overlay [Access – Location (Spacing) – New Access Points]
PO 4.1

Major Urban Transport Routes Overlay [Access - Location (Sight Lines)]
PO 5.1

Major Urban Transport Routes Overlay [Access - Mud and Debris]
PO 6.1

Major Urban Transport Routes Overlay [Access - Stormwater]
PO 7.1

Major Urban Transport Routes Overlay [Building on Road Reserve]
PO 8.1

Major Urban Transport Routes Overlay [Public Road Junctions]
PO 9.1

Major Urban Transport Routes Overlay [Corner Cut-Offs]
PO 10.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Water Quality]
PO 1.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Wastewater]
PO 2.1, PO 2.2, PO 2.3, PO 2.4

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Stormwater]
PO 3.1, PO 3.2, PO 3.3, PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Landscapes and Natural Features]
PO 4.1

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Water Quality]
PO 1.1

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Wastewater]
PO 2.1, PO 2.3, PO 2.4, PO 2.5

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Stormwater]
PO 3.1, PO 3.2, PO 3.3, PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Landscapes and Natural Features]
PO 4.1

Native Vegetation Overlay [Environmental Protection]
PO 1.1, PO 1.2, PO 1.4

Non-Stop Corridors Overlay [Non-Stop Corridor Overlay]
PO 1.1

Resource Extraction Protection Area Overlay [Protection of Strategic Resources]
PO 1.1

River Murray Flood Plain Protection Area Overlay [Wastewater]
PO 2.1

River Murray Flood Plain Protection Area Overlay [Built Form and Character]
PO 5.1, PO 5.3

River Murray Flood Plain Protection Area Overlay [Flood Resilience]
PO 6.1, PO 6.2

River Murray Flood Plain Protection Area Overlay [Environmental Protection]
PO 7.1, PO 7.2, PO 7.3

River Murray Flood Plain Protection Area Overlay [Access]
PO 8.1, PO 8.2, PO 8.3

Scenic Quality Overlay [Land Use and Intensity]
PO 1.1

Scenic Quality Overlay [Built Form and Character]
PO 2.1

Scenic Quality Overlay [Landscaping]
PO 3.1

Scenic Quality Overlay [Earthworks]
PO 4.1

Significant Interface Management Overlay [Land Use and Intensity]
PO 1.1

Significant Landscape Protection Overlay [Land Use and Intensity]
PO 1.1

Significant Landscape Protection Overlay [Built Form and Character]
PO 2.1, PO 2.2

Significant Landscape Protection Overlay [Landscaping]
PO 3.1

Significant Landscape Protection Overlay [Earthworks]
PO 4.1

State Heritage Area Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5

State Heritage Area Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Area Overlay [Conservation Works]
PO 7.1

State Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6, PO 1.7

State Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Place Overlay [Conservation Works]
PO 7.1

State Significant Native Vegetation Areas Overlay [Environmental Protection]
PO 1.1

Traffic Generating Development Overlay [Traffic Generating Development]
PO 1.1, PO 1.2, PO 1.3

Tunnel Protection Overlay [Land Use and Intensity]
PO 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
PO 2.1

Urban Transport Routes Overlay [Access - Safe Entry and Exit (Traffic Flow)]
PO 1.1

Urban Transport Routes Overlay [Access - On-Site Queuing]
PO 2.1

Urban Transport Routes Overlay [Access - (Location Spacing) - Existing Access Point]
PO 3.1

Urban Transport Routes Overlay [Access – Location (Spacing) – New Access Points]
PO 4.1

Urban Transport Routes Overlay [Access - Location (Sight Lines)]
PO 5.1

Urban Transport Routes Overlay [Access – Mud and Debris]
PO 6.1

Urban Transport Routes Overlay [Access - Stormwater]
PO 7.1

Urban Transport Routes Overlay [Building on Road Reserve]
PO 8.1

Urban Transport Routes Overlay [Public Road Junctions]
PO 9.1

Urban Transport Routes Overlay [Corner Cut-Offs]
PO 10.1

Water Resources Overlay [Water Catchment]
PO 1.1, PO 1.2, PO 1.5, PO 1.6, PO 1.7, PO 1.8
Tree-damaging activity \u00A0 None None NoneLocal Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

Regulated and Significant Tree Overlay [Tree Retention and Health]
PO 1.1, PO 1.2, PO 1.3, PO 1.4

Regulated and Significant Tree Overlay [Ground work affecting trees]
PO 2.1

Regulated and Significant Tree Overlay [Land Division]
PO 3.1

State Heritage Area Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1
Verandah \u00A0Built Form and Character
PO 2.2, PO 2.3
Clearance from Overhead Powerlines
PO 1.1

Design [All development [Earthworks and sloping land]]
PO 8.1

Design [All residential development and non-residential development [Ancillary Development]]
PO 13.1, PO 13.2, PO 13.3

Infrastructure and Renewable Energy Facilities [Wastewater Services]
PO 12.2
Adelaide Showgrounds Subzone [Land Use and Intensity]
PO 1.2

Adelaide Showgrounds Subzone [Built Form and Character]
PO 2.1, PO 2.2, PO 2.3
Airport Building Heights (Aircraft Landing Areas) Overlay [Built Form]
PO 1.1

Airport Building Heights (Regulated) Overlay [Built Form]
PO 1.1

Building Near Airfields Overlay
PO 1.3

Character Area Overlay [All Development]
PO 1.1

Character Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Character Area Overlay [Ancillary Development]
PO 4.1, PO 4.2

Character Area Overlay [Context and Streetscape Amenity]
PO 6.1, PO 6.2

Character Preservation District Overlay [Built Form and Character]
PO 2.1, PO 2.2

Character Preservation District Overlay [Built Form and Character in the Rural Area]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.5, PO 3.6

Character Preservation District Overlay [Earthworks]
PO 4.1

Coastal Areas Overlay [Hazard Risk Minimisation]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Coastal Areas Overlay [Coast Protection Works]
PO 3.1, PO 3.2

Coastal Areas Overlay [Environment Protection]
PO 4.1, PO 4.2, PO 4.3, PO 4.4, PO 4.6, PO 4.7

Coastal Areas Overlay [Access]
PO 5.1, PO 5.2, PO 5.4

Coastal Flooding Overlay
PO 1.1

Defence Aviation Area Overlay [Built Form]
PO 1.1

Future Local Road Widening Overlay [Future Road Widening]
PO 1.1

Future Road Widening Overlay [Future Road Widening]
PO 1.1

Gateway Overlay [Built Form and Character]
PO 1.1, PO 1.2

Gateway Overlay [Landscape Amenity]
PO 2.1

Gateway Overlay [Landscaping]
PO 3.1, PO 3.2, PO 3.3, PO 3.4

Hazards (Acid Sulfate Soils) Overlay [Land Use and Intensity]
PO 1.1

Hazards (Bushfire - General Risk) Overlay [Siting]
PO 1.1

Hazards (Bushfire - General Risk) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - General Risk) Overlay [Vehicle Access – Roads, Driveways and Fire Tracks]
PO 5.2

Hazards (Bushfire - High Risk) Overlay [Land Use]
PO 1.1

Hazards (Bushfire - High Risk) Overlay [Siting]
PO 2.1

Hazards (Bushfire - High Risk) Overlay [Built Form]
PO 3.1, PO 3.2

Hazards (Bushfire - High Risk) Overlay [Vehicle Access –Roads, Driveways and Fire Tracks]
PO 6.2

Hazards (Bushfire - Medium Risk) Overlay [Siting]
PO 1.1

Hazards (Bushfire - Medium Risk) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - Medium Risk) Overlay [Vehicle Access - Roads, Driveways and Fire Tracks]
PO 5.2

Hazards (Bushfire - Outback) Overlay [Vehicle Access - Roads and Driveways]
PO 2.2

Hazards (Bushfire - Regional) Overlay [Siting]
PO 1.1

Hazards (Bushfire - Regional) Overlay [Built Form]
PO 2.1, PO 2.2

Hazards (Bushfire - Regional) Overlay [Vehicle Access -Roads and Driveways]
PO 5.2

Hazards (Flooding) Overlay [Flood Resilience]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.5

Hazards (Flooding) Overlay [Environmental Protection]
PO 4.1, PO 4.2

Hazards (Flooding) Overlay [Site Earthworks]
PO 5.1, PO 5.2

Hazards (Flooding) Overlay [Access]
PO 6.1, PO 6.2

Hazards (Flooding – General) Overlay [Flood Resilience]
PO 2.1

Heritage Adjacency Overlay [Built Form]
PO 1.1

Historic Area Overlay [All Development]
PO 1.1

Historic Area Overlay [Built Form]
PO 2.1, PO 2.2, PO 2.3, PO 2.4, PO 2.5

Historic Area Overlay [Ancillary development]
PO 4.1, PO 4.2

Historic Area Overlay [Context and Streetscape Amenity]
PO 6.1, PO 6.2

Historic Area Overlay [Ruins]
PO 8.1

Historic Shipwrecks Overlay [General]
PO 1.1

Local Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6, PO 1.7

Local Heritage Place Overlay [Ancillary Development]
PO 3.1, PO 3.2

Local Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

Local Heritage Place Overlay [Conservation Works]
PO 7.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Water Quality]
PO 1.1

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Stormwater]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 1) Overlay [Landscapes and Natural Features]
PO 4.1

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Water Quality]
PO 1.1

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Stormwater]
PO 3.1, PO 3.2, PO 3.3, PO 3.4, PO 3.9

Mount Lofty Ranges Water Supply Catchment (Area 2) Overlay [Landscapes and Natural Features]
PO 4.1

Native Vegetation Overlay [Environmental Protection]
PO 1.1, PO 1.2, PO 1.4

River Murray Flood Plain Protection Area Overlay [Built Form and Character]
PO 5.1, PO 5.2, PO 5.3

River Murray Flood Plain Protection Area Overlay [Flood Resilience]
PO 6.1, PO 6.3

River Murray Flood Plain Protection Area Overlay [Environmental Protection]
PO 7.1, PO 7.2, PO 7.3

River Murray Flood Plain Protection Area Overlay [Access]
PO 8.1, PO 8.2, PO 8.3

Scenic Quality Overlay [Land Use and Intensity]
PO 1.1

Scenic Quality Overlay [Built Form and Character]
PO 2.1

Scenic Quality Overlay [Earthworks]
PO 4.1

Significant Landscape Protection Overlay [Built Form and Character]
PO 2.1, PO 2.2

Significant Landscape Protection Overlay [Landscaping]
PO 3.1

Significant Landscape Protection Overlay [Earthworks]
PO 4.1

State Heritage Area Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5

State Heritage Area Overlay [Ancillary Development]
PO 3.1, PO 3.2

State Heritage Area Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Area Overlay [Conservation Works]
PO 7.1

State Heritage Place Overlay [Built Form]
PO 1.1, PO 1.2, PO 1.3, PO 1.4, PO 1.5, PO 1.6, PO 1.7

State Heritage Place Overlay [Ancillary Development]
PO 3.1, PO 3.2

State Heritage Place Overlay [Landscape Context and Streetscape Amenity]
PO 5.1

State Heritage Place Overlay [Conservation Works]
PO 7.1

State Significant Native Vegetation Areas Overlay [Environmental Protection]
PO 1.1

Tunnel Protection Overlay [Land Use and Intensity]
PO 1.1

Tunnel Protection Overlay [Excavation and Ground Intruding Activity]
PO 2.1

Water Resources Overlay [Water Catchment]
PO 1.1, PO 1.2, PO 1.5, PO 1.6, PO 1.7, PO 1.8
All other Code Assessed Development All All All Any relevant Overlay: All
\u00A0

Table 4 - Restricted Development Classification

\u00A0
The following table identifies Classes of Development that are classified as Restricted subject to any 'Exclusions'.

Class of DevelopmentExclusions
Shop \u00A0

Any of the following:

\n
    \n
  1. shop with a gross leasable floor area less than 1000m2
  2. \n
  3. shop that is a restaurant.
  4. \n
\n
\u00A0

Table 5 - Procedural Matters (PM) - Notification

The following table identifies, pursuant to section 107(6) of the\u00A0Planning, Development and Infrastructure Act 2016, classes of performance assessed development that are excluded from notification. The table also identifies any exemptions to the placement of notices when notification is required.

Interpretation

Notification tables exclude the classes of development listed in Column A from notification provided that they do not fall within a corresponding exclusion prescribed in Column B.\u00A0

Where a development or an element of a development falls within more than one class of development listed in Column A, it will be excluded from notification if it is excluded (in its entirety) under any of those classes of development. It need not be excluded under all applicable classes of development.

Where a development involves multiple performance assessed elements, all performance assessed elements will require notification (regardless of whether one or more elements are excluded in the applicable notification table) unless every performance assessed element of the application is excluded in the applicable notification table, in which case the application will not require notification.

A relevant authority may determine that a variation to 1 or more corresponding exclusions prescribed in Column B is minor in nature and does not require notification.

Class of Development

(Column A)

Exceptions

(Column B)

  1. Development which, in the opinion of the relevant authority, is of a minor nature only and will not unreasonably impact on the owners or occupiers of land in the locality of the site of the development.

None specified.

  1. Any development involving any of the following (or of any combination of any of the following):
    1. advertisement
    2. change rooms
    3. outdoor sports courts
    4. playground
    5. protective tree netting structure.

Except development that does not\u00A0satisfy any of the following:

  1. Recreation Zone DTS/DPF 2.2
  2. Recreation Zone DTS/DPF 3.1
  3. Recreation Zone DTS/DPF 3.2.

\u00A0

  1. Any development involving any of the following (or of any combination of any of the following):
    1. indoor recreation facility
    2. market
    3. showground
    4. special event
    5. sporting clubrooms
    6. Swimming pool or spa pool and associated swimming pool safety features
    7. horse breeding, keeping, sales, training or stables ancillary to an existing racecourse

Except where the site of the development is adjacent land to a site (or land) used for residential purposes in a neighbourhood-type zone.

  1. Any development involving any of the following (or of any combination of any of the following):
    1. air handling unit, air conditioning system or exhaust fan
    2. carport
    3. deck
    4. fence
    5. internal building works
    6. land division
    7. open space
    8. outbuilding
    9. pergola
    10. private bushfire shelter
    11. recreation area
    12. replacement building
    13. retaining wall
    14. shade sail
    15. solar photovoltaic panels (roof mounted)
    16. swimming pool or spa pool and associated swimming pool safety features
    17. temporary accommodation in an area affected by bushfire
    18. tree damaging activity
    19. verandah
    20. water tank.

None specified.

  1. Any development involving any of the following (or of any combination of any of the following) within the Tunnel Protection Overlay:\n
    1. storage of materials, equipment or vehicles (whether temporary or permanent) over an area exceeding 100 square metres
    2. temporary stockpiling of soil, gravel, rock or other natural material over an area exceeding 100 square metres
    3. excavation or ground intruding activity at a depth greater than 2.5 metres below the regulated surface level.

Except where not undertaken by the Crown, a Council or an essential infrastructure provider.

  1. Demolition.

Except any of the following:

  1. the demolition (or partial demolition) of a State or Local Heritage Place (other than an excluded building)
  2. the demolition (or partial demolition) of a building in a Historic Area Overlay (other than an excluded building).
  1. Office.

Except office that does not\u00A0satisfy any of the following:

  1. Recreation Zone DTS/DPF 1.3
  2. Recreation Zone DTS/DPF 2.2
  3. Recreation Zone DTS/DPF 3.1
  4. Recreation Zone DTS/DPF 3.2.
  1. Railway line.

Except where located outside of a rail corridor or rail reserve.

  1. Shop.

Except shop that does not\u00A0satisfy any of the following:

  1. Recreation Zone DTS/DPF 1.2
  2. Recreation Zone DTS/DPF 2.2
  3. Recreation Zone DTS/DPF 3.1
  4. Recreation Zone DTS/DPF 3.2.
  1. Telecommunications facility.

Except telecommunications facility exceeding 30m in height or where the site of the development is adjacent land to a site (or land) used for residential purposes in a neighbourhood zone.

Placement of Notices - Exemptions for Performance Assessed Development

None specified.

Placement of Notices - Exemptions for Restricted Development

None specified.

\u00A0

Adelaide Showgrounds Subzone

\n
\u00A0

Assessment Provisions (AP)

\n
\u00A0
Desired Outcome (DO)
\u00A0
Desired Outcome
DO 1Multifunctional showground facilities and spaces catering to a wide range of cultural, agricultural, recreational, sporting and business events, conferences, shows, markets and exhibitions together with supporting administrative and visitor facilities.\u00A0\n
DO 2An area supporting transitional development between core showground facilities and adjacent areas along Leader Street and Rose Terrace achieve complementary land use and built form outcomes that support the multifunctional role of core showground facilities and spaces.\u00A0\n
\u00A0
Performance Outcomes (PO) and Deemed-to-Satisfy (DTS) Criteria / Designated Performance Feature (DPF)
\n
\u00A0
Performance OutcomeDeemed-to-Satisfy Criteria / Designated Performance Feature
Land Use and Intensity
PO 1.1
Showground facilities and spaces accommodating events, conferences, shows, markets and exhibitions together with associated administrative functions and visitor amenities are maintained for the long term education, entertainment and enjoyment of visitors, spectators, event competitors and businesses.\u00A0\n
DTS/DPF 1.1
None are applicable.\u00A0\n
PO 1.2
Development of land near the periphery of the subzone along Leader Street or Rose Terrace surplus to showground activities is compatible with showground facilities and provides an orderly transition to development outside the subzone to mitigate adverse impacts on residential amenity.\u00A0\n
DTS/DPF 1.2

Development comprising one or more of the following on a site adjacent land in another zone:\u00A0

  1. Car parking\u00A0
  2. Child care facility
  3. Community facility\u00A0
  4. Consulting room\u00A0
  5. Educational facility\u00A0
  6. Hotel
  7. Office
  8. Residential flat building\u00A0
  9. Restaurant\u00A0
  10. Service trade premises
  11. Shop
  12. Tourist accommodation
  13. Warehouse
PO 1.3
Shops are ancillary to showground facilities to enhance visitor experiences or provide a local convenience as part of a transitional development at the subzone interface that complements the role of activity centres.\u00A0\n
DTS/DPF 1.3

Shop where one of the following applies:\u00A0

  1. is ancillary to showground facilities\u00A0
  2. with a gross leasable floor area up to 500m2 in a single building.\u00A0
PO 1.4
Offices or consulting rooms are ancillary to showground activities, or on sites with an interface with Leader Street or Rose Terrace at a scale appropriate to maintain the local character and amenity.\u00A0\n
DTS/DPF 1.4
None are applicable.\u00A0\n
Built Form and Character
PO 2.1
Buildings are generally medium rise, and where fronting Leader Street provide an orderly transition to the built form scale envisaged in any adjacent neighbourhood-type zone to complement the streetscape character.\u00A0\n
DTS/DPF 2.1
None are applicable.\u00A0\n
PO 2.2

Buildings fronting a public road are setback from the road frontage to:\u00A0

  1. enable provision of a pedestrian walkway and environment of sufficient width and amenity to safely and conveniently accommodate expected pedestrian movements
  2. and\n
  3. complement the prevailing streetscape character.\u00A0
DTS/DPF 2.2
None are applicable.\u00A0\n
PO 2.3
Buildings adjacent to Leader Street or Rose Terrace include activities that contribute to active street frontages, of a scale that minimises impact on residential amenity in any adjacent neighbourhood-type zone.\u00A0\n
DTS/DPF 2.3
None are applicable.\u00A0\n
\u00A0
","DocTree_text":"Recreation Zone","DocTree_Number":"2.34","Community_Area":"Current","AnswerID":0,"DocumentPoint":0,"DocLevel":2,"ShowInstructions":false,"HasLinkedZones":false,"LoLinkZone":"","HasLinkedActs":false,"LoLinkActs":"","HasLinkedDocs":false,"LoLinkDocs":"","error":false,"errorMessage":""}